Böker Magnum Long Lead EDC 01SC080
Code: 01SC080
Böker Magnum Long Lead EDC 01SC080
Loading...

Böker Magnum Long Lead EDC 01SC080

Code: 01SC080
Delivery to
In Stock 1 pcs
11.4.2025
TIP! Buy before 13.00 and your order will be sent the same day.
Watch
€34

Do you have account? We have discounts for you.

Register now and get 2% discount.

Registration

Customer support

Call us every working day 8.00–16.30

Exceptional customer service
Exceptional customer service
We care. Call us or email us. Our staff will be glad to help you.
Loyalty discounts up to 10 %
Loyalty discounts up to 10 %
For registered customers. 2 % discount right after registration.
Shipping within the European Union
Shipping within the EU
Kniland ships your orders to almost all European Union countries.

Product detailed description

No product's description available

Additional parameters

Knife type: Folding
Steel type: Stainless steel
Blade material: 8Cr13MoV
Handle material: G10
Lock type: Slipjoint
Sheath: no sheath
Overall length: 18,4 cm
Blade length: 8 cm
Blade length category: 8,00 - 8,99 cm
Blade thickness: 2,7 mm
Weight of knife: 78 g
Blade shape: Drop Point
Blade finish: Satin
Blade grind: Flat
All parameters
You will find the product in this category
Folding knives
0,0

Be the first who will post an article to this item!

5
0x
4
0x
3
0x
2
0x
0x
Do not fill out this field:

For our registered customers, we offer loyalty discounts of up to 10%.

All you have to do, is register as our customer, and you will automatically receive a 2% discount on your first order. You must be logged in to your customer account to see the discount.

For each additional order, the discount will be calculated from the volume of previous purchases.

If you are logged in, the prices you see already include your discount. If you are not logged in, you can see the regular prices.

Discounts will be applied as follows:

Past purchases volume Discount in %  
First order 2 %  
over € 300 3 %  
over € 400 4 %  
over € 500 5 %  
over € 600 6 %  
over € 700 7 %  
over € 800 8 %  
over € 900 9 %  
over € 1000 10 %

 

boker-magnumBöker has a long history dating back to the end of the 17th century, when a German manufacturer of work tools was promoted to a manufacturer of swords and knives. Since then, the company has developed from its roots in Germany and currently produces various brands around the world.

The Magnum by Böker brand manufactures its knives in Taiwan and China and provides Böker reliability and unique design with a focus on maintaining favorable prices. Magnum by Böker knives are designed for casual wear and work, with an elegant design and affordable prices. Unrivaled price / quality / performance ratio, that's Magnum by Böker.

You might be interested in